How Vinyl Liner Pools are installed

Excavation, PCC, RCC of bottom slab are like the Gunite / Concrete tile Pool whereas the retaining walls Installation is of Polypropylene Panels for the structure & are reinforced with steel & cement over which vinyl-liner sheet is installed. It takes around 4 weeks to build such pools